Chelsea Sutton Estate

Chelsea, London

The Chelsea Sutton Estate in Chelsea, blocks E to O, is undergoing major refurbishment works. These homes are being refurbished with new windows, roofs, door entry systems, lift upgrades and new kitchens and bathrooms, among other improvements.

Blocks E to O are being refurbished with new windows, roofs, door entry systems, lift upgrades and new kitchens and bathrooms.

ClientClarion Housing
ContractorWPS
Resident engagement platformEbrik Standard Package
Open the live resident site

Construction progress

All video content was captured and produced by Ebrik's team of videographers.

The videos and information below are only a short overview of the actual platform, to view all the information go to the live platform.

  1. Step 1Complete

    Internal improvements

    Phase one includes renovating all the kitchens, bathrooms, the lift system and front doors.

    From site

    AboutMay 2021

    A short explanation of how the old kitchen and bathroom fixtures and fittings are removed in preparation for the improved units.

  2. Step 2Complete

    External facade

    Phase two involves improving the external facade and revamping the entry system.

    From site

    Site tourMarch 2025

    The scaffold is raised at the rear of the building so the facade works can continue.

    Site tourDecember 2025

    New windows are carefully fitted into the rear elevation, bringing light and a polished look to the space.

    Site tourJuly 2026

    The striking of the scaffold wraps up, revealing the fully restored external facade.

  3. Step 3Complete

    Roof works

    This phase is all about repairing and improving the building's roof and loft areas.

    From site

    Site tourOctober 2025

    The roof's parapets and copings are given a new lead covering, keeping the building watertight for years to come.

  4. Step 4In progress

    Communal areas

    We will upgrade and improve all aspects of the shared spaces, including a new entry system and repairs to the outside spaces.

    From site

    Site tourJuly 2026

    A new entrance system is installed, with mag locks and call points connected to each apartment.